Bde Maka Ska/Harriet Plan Approved With Significant Progress

Tonight, the Park Board's Planning Committee unanimously approved a sweeping 25-year vision for improvements in the area. It comes with restoring the name Bde Maka Ska to replace Lake Calhoun, a new land bridge to connect Bde Maka Ska and Isles over Lake Street, and much more. Here's some details.

The Tunnel that Still Can

For some reason (apparently concern over reported near crashes), the draft plan had included closing bike access in the Lake Street underpass connecting Bde Maka Ska and Isles (and replacing with street crossing of Lake Street). After receiving 443 comments opposed to removing this connection (by far the most comments of any area), Commissioner Erwin moved an amendment to keep as is and it passed no problem. We're glad for that!

Underpass picture

Image: Steve Brandt, Star Tribune

Bde Maka Ska!

Tonight's public hearing included many impassioned speakers in support of restoring the Dakota name to replace Lake Calhoun. We are very glad for the restorative justice work being done in this plan to honor the historic and present connection to the water and land with the Dakota people, including making Bde Maka Ska the official name again.

Bde Maka Ska Sign

Image: Peter Cox | MPR News

Transforming the Lower East Side of Lake Harriet

Oh what you can do when you replace a road for cars with trail and green space! Thanks to 408 people who supported this in the public comment period!

Current Lower East Harriet Parkway (right side is a lane for cars):

Current_Lower_East_Harriet.png

Proposed (no cars allowed):

East_Harriet_Trail_Improvement.png

Making More Space for People Along Lake Street

The previously finished West Lake Street Multimodal Transportation Study identified narrowing Lake Street to make more room for people walking and biking. Definitely a great thing!

Currently Lake is super fast and wide and people are squeezed big time:

Existing_Lake_Street.png

Plans change that up big time, including supporting two-way bike traffic:

Narrowed_Lake_Street.png

 

Two-way Bike Trails Get More Study

After receiving 401 comments in support of two-way bike trails around the Lakes, the plan was amended to include a commitment to doing more study of the possibility. Previously, the Park Board had it rejected it over concerns over more pavement and tree loss. Narrow car lanes, and we bet we can accomplish a lot without sacrificing green. We're glad they will take another look. We'll have to stay engaged since they shot this down before.

A Land Bride to Swoon Over

One of the most ambitious items in the plan is a "long-term" $39.5 million land bridge to connect Bde Maka Ska and Isles over Lake Street. We're not sure how it's getting funded, but it's certainly exciting to think about.

Bde_Maka_Ska_to_Isle_Land_Bridge_Over_Lake_Street.png

 

The Don't Walk Sign We Hope to Change Back

The final draft plan had included a new street-level crossing of Lake Street at East Lake Calhoun Parkway where there isn't one currently. Commissioners amended the plan to remove this crossing because of concerns over safety. The Pedestrian Advisory Committee, Bicycle Advisory Committee, and us all supported this in addition to retaining the underpass. It would be a valuable new connection that will take strain off the underpass. And it can certainly be done safely or we wouldn't support it. We hope this will be changed back when the full Park Board considers the plan in the next month.

Location of previously proposed new crosswalk/trail:

New_Crosswalk_Location.png

 

Big Thanks!

Thank you to everyone who engaged on the plan. Thanks to the Sierra Club North Star Chapter for helping engage so many people in commenting on the plan. Thanks to everyone who stood up for Bde Maka Ska, especially the native leaders and neighbors. Thanks to the volunteers (especially Ben and Janelle) and other partners (BAC, PAC, Bicycle Alliance) who played a key role. Thanks to Park Board staff who put a ton into this; really amazing. And thanks to the Commissioners for listening to feedback.

Now to implementation! :-)

 

Be the first to comment

Please check your e-mail for a link to activate your account.

connect